Lead Acid Battery Double Sides Pasting Machine
The Double side pasting machine is a special equipment for the grid pasting of lead-acid battery, suitable for production requirements of starting battery plate, traction battery plate and industry large plate, has the advantages of reasonable structure, stable starting, convenient operation, easy maintenance and high production efficiency.
1. Total Power: 13.5kw
2. Width of pasting strip: 400mm, width of pasting: 120-350mm
3. Thickness of grid: 1.1-5.0mm
4. Suitable paste:sand paste. Apparent density: 3.25—4.5g/cm3
5. The weight deviation of pasting is less than ±5g/panel
6. Production capacity: 70-140 panel/min
7. Dimension: 3800×1100×1800mm(length×width×height)
Characteristic
1. The host drive and hopper transmission adopts frequency control, realize stepless speed regulation, grid with various thickness can be pasted, to suit for a variety of speed and all kinds of paste grid; Upper grid mechanism lengthening, guarantee the stability of the upper grip; the full range of spray treatment, better of acid proof and antirust.
2. Paste box adopts reasonable double-layer wallboard separation device, make the paste difficult to enter the bearing, thereby improving the service life of the bearing, reduce maintenance cost.
3.The hopper adopts concentrated lubrication, which is convenient for the operator to maintain the equipment.
4. The paste roller in the paste box is reasonable in design, good in strength and no breaking phenomenon.
5. The reducer adopts the Zhejiang SANLIAN group and has good performance. The paste box bearing is imported from Japan.
Factory Display
Professional battery manufacturing equipment standardized production process
Why choose us
BETTER has developed into an innovative enterprise to provide general contracting system integration services, including R&D and design, project planning, complete equipment, installation and commissioning, technical output, technical training, after-sales guarantee and so on. We has created“China's First Station” and became the "Purchasing Center in China" for many international customers. BETTER took the lead in putting forward the concept of battery industry full-resource operation, and thoroughly solved problems including the long project construction period, heavy technical communication task, unreasonable production line matching, and cumbersome business communication arising from purchasing from multiple sources by customers.
Packing & Delivery
Packing: Wooden case, export standard package
Delivery Time: Delivery in 30 days after receipt of advance payment.
Team Style
Colorful team activities
Better Technology Group Limited
Integrated Solution Operator for Global Battery Manufacturing