Battery Continuous Grid Casting Machine/Line
Grid Photo
Components
① Cooling water and lubricant oil system
② Mold constant TMP. Cycling system
③ Lead furnace and automatic supply system
④ Casting mold
⑤ Main casting machine
⑥ Traction(Deburring) machine
⑦Winding machine
Casting Mold
60,000-70,000 big pieces
8 hours Two fixed molds to ensure the life span
Main Casting Machine
Big monitor, independent control
Mold easy dismantle system
Three shoes for pressure control
Traction(Deburring)Machine
Hot air blow system
Deburring system
Plate dimension adjustment system
Winding Machine
Horizontal winding
Frequency speed control
Winding capacity≥10,000 pieces
Lead Furnace
Completely sealed
Individual section TMP. control
Automatic lead supply
Lead Pump
Constant lead supply
Frequency speed control
Easy maintenance
Mold Constant TMP. Cycling system
Pre-heating available
Constant TMP.adjustment
Filter changed on line
Lubricant oil system
Oil quantity controlled
Uniform lubrication
Mold life span gets expanded
Cooling water system
Cycling cooling
Automatic constant TMP.
TMP.adjustment available
Plate features under continuous casting
You can note the difference!!
Plate design dimension
Lead consumption compared with traditional casting machine
Energy&Labor consumption compared with traditional casting
Factory Display
Professional battery manufacturing equipment standardized production process
Why choose us
BETTER has developed into an innovative enterprise to provide general contracting system integration services, including R&D and design, project planning, complete equipment, installation and commissioning, technical output, technical training, after-sales guarantee and so on. We has created“China's First Station” and became the "Purchasing Center in China" for many international customers. BETTER took the lead in putting forward the concept of battery industry full-resource operation, and thoroughly solved problems including the long project construction period, heavy technical communication task, unreasonable production line matching, and cumbersome business communication arising from purchasing from multiple sources by customers.
Packing & Delivery
Packing: Wooden case, export standard package
Delivery Time: Delivery in 30 days after receipt of advance payment.